Louisiana's new META datacenter is estimated to cost $140-$250 billion dollars once fully deployed (~$100B for the AI accelerators alone) [1]. Imagine being able to destroy $140B-$250B with a missile strike! There would be ripples through the whole world economy.
[1] Sample price info source where cost can be extrapolated: https://epoch.ai/data/ai-data-centers/directory/meta-hyperion Scaling its $61.8 billion projection from 1.63 GW to the full 5 GW produces approximately $189 billion.
This is interesting to me from a consequence perspective. I think hitting datacenters is going to be the next big thing. I just posted the following in another thread:
Louisiana's new META datacenter is estimated to cost $140-$250 billion dollars once fully deployed (~$100B for the AI accelerators alone) [1]. Imagine being able to destroy $140B-$250B with a missile strike! There would be ripples through the whole world economy.
[1] Sample price info source where cost can be extrapolated: https://epoch.ai/data/ai-data-centers/directory/meta-hyperion Scaling its $61.8 billion projection from 1.63 GW to the full 5 GW produces approximately $189 billion.