1
15
submitted 5 hours ago by yogthos@lemmy.ml to c/technology@lemmy.ml
2
17
submitted 11 hours ago by yogthos@lemmy.ml to c/technology@lemmy.ml
3
25
submitted 13 hours ago by yogthos@lemmy.ml to c/technology@lemmy.ml
4
1
submitted 12 hours ago by answerplume@lemmy.org to c/technology@lemmy.ml

This is a dated snapshot, not a ranking of AI search engines.

I published a public dataset of what one AI web-search answer tool cited for 48 "best … 2026" buying questions. On four weekday mornings, Nov 3–6, 2026 (America/Los_Angeles), I ran 12 queries a day through a single engine — the search tool built into our research agent — and recorded the five source links on each answer, plus the first brand the answer named. That is 240 citation rows. The four original CSVs, a combined file, the method, and SHA256 hashes are here:

https://answerplume.venturesites.workers.dev/data/

It is one engine, one run per query, one location. I did not test ChatGPT, Perplexity, Gemini, or Google AI Overviews. The "who owns this domain" labels (domain_type) are mine, and the label vocabulary is not the same on every day (Nov 3 uses vendor / vendor (platform); Nov 5 and Nov 6 use brand; the Nov 4 consumer file has no brand/vendor label).

Counted from those CSVs:

  • 0 of 60 citations on the 12 consumer product queries (Nov 4) were a brand's own site. Publishers took 37 of 60; forbes.com and nytimes.com together were 10 of those 60. Every one of those 12 answers still named a first brand.
  • Under each day's own brand/vendor labels, 77 of 240 citations (32%) were brand- or vendor-owned, and 19 of 48 answers cited no such source. The brand/vendor share was 32 of 60 on the Nov 3 B2B software set and 28 of 60 on the Nov 6 SaaS set.
  • Across all 240 rows there are 193 distinct cited domains. Ten domains appear three or more times; forbes.com is first with 8. 165 domains appear once.

48 queries is a small snapshot. A re-run of the same engine, or a different engine, could look different.

I made this for AnswerPlume, which is our AI-search citation project. This post is the dataset, not a product pitch. License: CC BY 4.0.

5
166

You are probably already aware of the recent Microsoft outage. For more than a day last week, a large share of the world’s office workers could not reliably send or receive email.

The trouble started on the afternoon of Nov. 12, when Outlook users found they could no longer reach their mailboxes. Within about an hour, Downdetector had logged reports from 74 countries and territories. Teams and Copilot features that rely on Exchange Online broke too.

Government systems in Singapore and Japan were hit, as were communications at the Supreme Court of the Philippines and, in Australia, the federal police and the country’s spy agency.

Microsoft said the outage was not a cyberattack. In a preliminary explanation, it pointed to an issue from an earlier network capacity upgrade that surfaced after a more recent network change. The company declared service fully restored early on Nov. 14, and has promised a full post-incident report.

The disruption is the latest in a run of Exchange Online failures this year. On Aug. 31, a bad authentication configuration knocked out email and spilled over into Teams, SharePoint, OneDrive and Defender for about 12 hours. Some estimated that lost productivity from the November outage could approach $7 billion.

For the companies selling open source alternatives to Microsoft’s products, the episode is a chance to make an argument they have been making for years. It’s FOSS asked several of them what governments and businesses should be thinking about as they recover. Their answer, broadly, was not that their software never fails. It was that no single company should be able to stop an entire economy’s email at once.

“Errors can happen to any provider,” said Peter Ganten, the chief executive of Univention, a German company that makes open source identity management software. “The more important question is concentration.”

“When hundreds of millions of people in thousands of organizations worldwide depend on the same infrastructure, running the same software and managed by the same company, a single fault in the wrong place can bring public life to a standstill,” Ganten said. This failure appears to have been technical, he noted, but “an external attack could have had equally severe consequences.” The same dependency, he added, leaves entire economies exposed to sudden price increases or politically motivated service restrictions.

The scale he describes is real. Microsoft reported more than 450 million paid commercial seats for Microsoft 365 in January this year.

Nextcloud, which makes a self-hostable file sharing and collaboration suite, struck a gentler note while the outage was still unfolding. “Mistakes happen in the IT industry,” Jos Poortvliet, a co-founder of the company, said in a statement on Friday. “This holds true for companies of all sizes, including us. Our heart goes out to all the admins today.”

But he too pointed to concentration. “Especially in critical infrastructure, monopolies are increasing the risk of stalling businesses globally if an incident occurs,” Mr. Poortvliet said. “When everything is hanging on a single vendor, companies can’t switch providers quickly to get back up and running, or have a second setup as backup, or pull the plug when under attack and keep working air-gapped.”

The weak point is the login

The outages this year have shown how one fault can spread. In August, a problem with Microsoft’s authentication configuration did not just break email. It took down other Microsoft 365 services that sit on the same sign-in layer.

Ganten said that was the risk worth worrying about most. “When authentication fails, every service that depends on it fails with it,” he said. Identity, in his view, should be an open and separate layer that different providers can run, so that services stay reachable when one of them goes down. Univention sells an identity platform, Nubus, built on that idea.

‘Outsourced operations’ is not ‘outsourced risk’

Galina Goduhina, the commercial director of ONLYOFFICE, an open source office suite, said organizations had misread what the cloud bought them. “The cloud has made infrastructure someone else’s problem, but it hasn’t made downtime someone else’s consequence,” she said. “Organizations need to stop confusing outsourced operations with outsourced risk.”

The question, she said, is whether an organization has “enough control, portability and independence to keep working when their primary provider cannot.”

She was candid that open source software is not immune. “The difference isn’t that open source fails less,” Ms. Goduhina said. “It’s that failure doesn’t necessarily leave you waiting for a single vendor to act.” Whether organizations can actually use that freedom, she added, depends on their preparation.

That raises an obvious objection: moving from Microsoft’s cloud to another company’s cloud could simply trade one dependency for another. Ganten agreed that it can. “It does, unless the software is open source and built on open standards,” he said. Such software can be run without its original vendor and, in the worst case, maintained by someone else entirely. Leaving is harder than it looks

None of the companies suggested that switching is quick. Asked what it would take for a 500-person organization to move off Exchange, Goduhina said the mailboxes were the simple part.

“Moving 500 mailboxes is the easy part to estimate,” she said. “Replacing years of accumulated integrations, permissions and habits is not.” She would plan for several months, starting with an audit of dependencies and a pilot group. “The biggest migration risk is discovering too late that Exchange was doing far more than handling email.”

Some governments have already done it. The German state of Schleswig-Holstein moved more than 44,000 mailboxes from Exchange to Open-Xchange by October 2025. Poortvliet said open source alternatives “exist, are ready to use and have been proven at scale.”

For organizations that are not ready to leave, Ganten suggested a smaller step. Where critical services are involved, he said, organizations should be able to keep at least a minimal operation running without their usual provider.

“This fallback,” he said, “must be rehearsed regularly.”

6
28
submitted 1 day ago by yogthos@lemmy.ml to c/technology@lemmy.ml
7
34
submitted 1 day ago by chobeat@lemmy.ml to c/technology@lemmy.ml
8
27
submitted 1 day ago by yogthos@lemmy.ml to c/technology@lemmy.ml
9
149
submitted 2 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
10
56
submitted 1 day ago by Zerush@lemmy.ml to c/technology@lemmy.ml
11
35

Full article

United Launch Alliance’s Vulcan rocket and 40 Amazon Leo broadband satellites fell back to Earth minutes after liftoff Sunday, a crushing setback that will ripple across all sectors of the US space industry.

The Vulcan rocket is on contract to launch roughly half of the US military’s national security space missions in the next few years, and Sunday’s mission was the first of 38 Vulcan launches booked by Amazon to build out its network of broadband Internet satellites aimed at competing with SpaceX’s Starlink. Sunday’s failure is expected to ground the rocket for an indefinite period of time.

Vulcan is no stranger to close calls, having overcome failures with its strap-on solid rocket boosters on two of its four previous flights. In each case, the rocket corrected for those problems and continued into orbit to deploy its payloads. The incidents trigged months-long reviews and investigations before ULA could resume Vulcan flights.

Sunday’s launch succumbed to a different kind of failure. The six solid rocket boosters appeared to perform well in the first two minutes after Vulcan’s liftoff from Cape Canaveral Space Force Station, Florida, at 12:40 pm EDT (17:40 UTC).

In a statement, ULA said the rocket “suffered an anomaly 10 minutes into the flight and failed to deliver the Amazon mission to orbit.” The company said it did not immediately have “any specific data to understand what occurred.”

“ULA exists to provide assured access to space for our nation and for the customers who depend on us,” the company said in a statement. “That purpose is why we take on some of the hardest missions in spaceflight, and why we hold ourselves to the standard of mission success. Today, we did not meet that standard.”

Engineers will investigate the failure to “find the cause, determine the appropriate corrective action, and return to flight as quickly as possible,” ULA said.

“ULA is committed to full transparency with our customers, and they will have visibility into the investigation process, which utilizes rigorous methodology and corrective action. We will provide further updates when new information becomes available.”

Something amiss

The first indications of trouble Sunday appeared to crop up before the 10-minute mark of the flight, the point in time when ULA initially said the anomaly occurred.

Multiple sources told Ars the anomaly that impacted the launch occurred in the booster stage of the rocket, not the Centaur V upper stage or the solid rocket boosters. It could not immediately be determined whether the booster stage issue was caused by the two methane-burning BE-4 engines that power it, some other part of the booster that feeds propellant into the engines, or another problem.

Heading northeast from Cape Canaveral, Vulcan jettisoned its spent solid rocket boosters on time, leaving the launcher flying on the power of its twin BE-4 main engines supplied by Blue Origin, Jeff Bezos’s space company. The BE-4s, each designed to produce more than a half-million pounds of thrust, were supposed to shut down just shy of the flight’s five-minute mark. However, they continued firing for at least 30 additional seconds.

Such an overburn could be an indication the booster stage was not performing as expected and operated longer to try to compensate for the underperformance.

A mission animation on ULA’s broadcast, driven by real-time telemetry data from the rocket, showed Vulcan start to spin moments after booster engine shutdown. The spin continued through separation of the rocket’s Centaur V upper stage a few seconds later. ULA’s launch commentator confirmed ignition of the Centaur’s two RL10 engines, and the animation showed them vectoring thrust in an apparent attempt to put the rocket back on course.

ULA ended its live broadcast a few minutes later without discussion of the anomaly. The company then released a statement on social media declaring the launch a failure. This was the first total mission failure for United Launch Alliance since its formation in 2006 with the merger of the rocket divisions of Boeing and Lockheed Martin.

Wider impacts

Sunday’s incident is bad news for ULA’s two primary customers: Amazon and the US Space Force. It’s also a potential setback for NASA’s Artemis program to return astronauts to the Moon.

First, Amazon. The loss of 40 Amazon Leo satellites onboard the Vulcan rocket is, by itself, a secondary concern next to the inevitable grounding of the company’s primary launch provider. Amazon has 37 more Vulcan launches reserved with ULA, each of which is slated to deliver 40 or more Amazon Leo satellites to orbit.

The Amazon Leo constellation today consists of 396 satellites, a fraction of the network’s planned total of 3,292 first-generation spacecraft. Amazon officials told Ars in October that the company has enough satellites to start initial commercial Internet service by the end of the year, but more launches are required to realize the network’s full capacity.

Amazon is setting up its service as the first head-to-head competitor in the consumer satellite broadband market with the Starlink network owned by Elon Musk and SpaceX. OneWeb and other companies also offer Internet connectivity from space, but their business models focus on beaming capacity to traditional telco providers, not directly to consumers.

Previous delays with the Vulcan rocket have kept Amazon satellites on the ground far longer than the company planned. Amazon recently announced it manufactured its 1,000th satellite, meaning more than half of its network nodes are sitting in storage. Finally, Amazon was looking forward to ramping up its launch cadence, with Sunday’s launch the first for Amazon Leo on ULA’s Vulcan rocket.

“There is risk with any launch, and that’s especially true for inaugural missions like LV-01,” Amazon said in a statement. “ULA has been a trusted partner for Amazon, and we believe they’ll learn from this mission and deliver on their long-term plans for Vulcan.”

Amazon made launch bookings with Europe’s Arianespace and Bezos’s Blue Origin at the same time it signed the contract for 38 Vulcan launches in 2022. Amazon reserved additional launches with Arianespace in September, bringing that company’s total contract to 24 launches for Amazon. Three have launched so far, and the fourth is set to take off later this month on an Ariane 6 rocket from French Guiana.

Blue Origin’s New Glenn rocket has also encountered setbacks on its early missions. Most recently, a New Glenn rocket exploded during a ground test in Florida in May, knocking Blue Origin’s launch pad offline until at least the end of this year. The New Glenn that exploded was supposed to launch a batch of Amazon Leo satellites, but luckily for Amazon, the payloads were not stacked aboard the rocket at the time.

What’s more, the New Glenn rocket uses a version of the BE-4 engine similar to the one that flies on ULA’s Vulcan rocket. Investigators traced the New Glenn explosion to a faulty valve on one of the booster’s BE-4 engines. If engineers determine a BE-4 was at fault on Sunday’s Vulcan failure, it could stand in the way of Blue Origin returning New Glenn to flight early next year.

That would mean more delays for two of the rockets Amazon needs to get its satellites in orbit. Amazon’s past rocket woes forced officials to contract with SpaceX, Bezos’s chief competitor in the satellite broadband and launch sectors, to use its workhorse Falcon 9 rocket to speed up Amazon Leo deployment. Amazon has 10 more missions booked on SpaceX’s Falcon 9, and will presumably be unable to buy more as SpaceX moves the rocket toward retirement.

It’s a similar story for the Space Force, which relies upon SpaceX and ULA to launch the military’s most sensitive national security satellites. The Space Force in 2025 added Blue Origin’s New Glenn as a third option to launch the country’s critical military payloads.

Vulcan’s earlier delays forced Space Force officials to move six national security launches from ULA to SpaceX. Military officials used the swaps to get time-sensitive payloads into space sooner on Falcon 9 or Falcon Heavy, rather than waiting for Vulcan. In exchange, the Space Force awarded a future SpaceX mission to ULA. A US Space Force GPS navigation satellite is seen during encapsulation inside a Falcon 9 payload fairing. The eight newest GPS satellites all launched on SpaceX rockets. Credit: SpaceX

Expect more Space Force rocket swaps after Vulcan’s errant launch Sunday. For the foreseeable future, the Pentagon will only increase its already heavy dependence on SpaceX to send US national security satellites to space as military leaders race to keep pace with China’s growing presence in orbit.

But SpaceX has made it clear Falcon 9 and Falcon Heavy won’t be around much longer. Musk’s company is rapidly transitioning to Starship to launch its own Starlink satellites and new orbiting AI-powered compute platforms. SpaceX has not revealed plans yet to certify Starship for national security missions, a process that would take multiple years.

Amazon will likely have to use the 10 Falcon 9 launches it has already reserved and Europe’s Ariane 6 rocket to add any more Amazon Leo satellites to the network in the coming months. Blue Origin’s New Glenn, once it returns to flight, has a series of backlogged launches for NASA’s Artemis Moon program next year, including key test flights of Blue’s lunar lander to prepare for future human missions. Those Moon lander tests could be pushed back further if the BE-4 engine was at fault for Sunday’s failure.

NASA’s lunar program has another important link to the Vulcan rocket. The space agency recently announced it selected a version of ULA’s Centaur upper stage for future flights of NASA’s Space Launch System rocket, the vehicle used for launching astronaut crews to the Moon. The Centaur will replace a more expensive, unproven Boeing upper stage design. NASA officials will want to rule out a problem with the Centaur V upper stage on Sunday’s doomed launch as the agency aims to start flying ULA’s Centaur on SLS missions for crewed lunar flights as soon as 2028.

“Appreciate you quickly keeping the public and your partners informed,” NASA Administrator wrote in reply to ULA’s statement on the Vulcan launch anomaly. “The team at NASA is available to assist in all matters related to the investigation and remediation effort. Artemis, Moon Base, and the nation need ULA. We are in your corner and here to help.”

12
32

Huang’s exit plunges the $4 trillion company into uncertainty and threatens to disrupt an AI ecosystem that he helped bankroll by pouring Nvidia’s swelling cash pile back into cloud providers, suppliers and the industry’s biggest labs, including in Israel.

Nvidia’s operations in the Jewish state are the firm’s largest outside of the US. Despite the past three years of war, the chipmaker’s workforce expanded to more than 5,000 employees staffed across seven R&D centers, from Yokne’am in the north through Tel Aviv, Jerusalem and Ra’anana in the center of the country to Beersheba in the south.

In December last year, Huang spearheaded ambitious plans for a “multibillion-shekel” R&D campus in the northern town of Kiryat Tivon, bringing some 10,000 jobs to a region outside Haifa with designs for creating a tech hub. Construction on the 160,000-square-meter tech campus was scheduled to begin in 2027 and be completed by 2031, marking Nvidia’s eighth such center in the country.

13
10
submitted 1 day ago by yogthos@lemmy.ml to c/technology@lemmy.ml
14
-2

Visualizing AI concepts without relying on text

Saw a post in r/artificial on November 17, 2026, titled "How to explain AI with no words." It highlights a trend where multimodal creation is moving beyond purely descriptive text to visual or purely auditory explanations. For those focused on AI voice and multimodal workflows, this suggests a shift in how we communicate complex technical ideas—less definition, more demonstration. How are you finding visual or non-verbal methods more effective than text when explaining AI concepts to peers?

More: AitoAll Social Poster Studio ·

15
36
submitted 2 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
16
35
17
27
submitted 2 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
18
47
submitted 2 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
19
8
submitted 2 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
20
52
submitted 3 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
21
49
submitted 3 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
22
35
submitted 3 days ago* (last edited 3 days ago) by morto@piefed.social to c/technology@lemmy.ml

While the more influential brands abandoned small phones long ago, a few smaller chinese brands seem to be making a lot of smaller phones lately. We already had the soyes phones in the market, but they're very niche and not capable of all tasks, but since last year, with the launch of the bluefox nx1, we started getting many more. Just this year, according to gsmarena, we got:

  • Oukitel C17 mini
  • Ulefone Note 22
  • Oukitel C26 mini
  • Blackview Wave 2C
  • Oscal flat 3C mini

And aiphor is planning to launch a new bluefox model

So far, most of them are still quirky phones, but it was long ago since we had such a diversity in small phones, and there are a few models coming with reasonable performance. This may be the opening in the market many of us have been rooting for long ago. Let's see if this segment survives and becomes stable enough for small phones to become viable for anyone that wants them again.

Oh, and I forgot about the Samsung Galaxy S26, which can be considered small by some people, and is definitely smaller than what most larger brands have been making.

23
12
Building an infrared camera (studiowetware.com)
submitted 3 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
24
74

Global Microsoft outage 2 days after a vast Patch Tuesday with mostly AI-written code.

FAA forced to ground all domestic flights in America one day after launching new AI-powered tools.

I mean, it's probably just coincidental, right?

25
33
submitted 4 days ago by yogthos@lemmy.ml to c/technology@lemmy.ml
view more: next ›

Technology

43592 readers
163 users here now

This is the official technology community of Lemmy.ml for all news related to creation and use of technology, and to facilitate civil, meaningful discussion around it.


Ask in DM before posting product reviews or ads. All such posts otherwise are subject to removal.


Rules:

1: All Lemmy rules apply

2: Do not post low effort posts

3: NEVER post naziped*gore stuff

4: Always post article URLs or their archived version URLs as sources, NOT screenshots. Help the blind users.

5: personal rants of Big Tech CEOs like Elon Musk are unwelcome (does not include posts about their companies affecting wide range of people)

6: no advertisement posts unless verified as legitimate and non-exploitative/non-consumerist

7: crypto related posts, unless essential, are disallowed

founded 7 years ago
MODERATORS