this post was submitted on 12 Feb 2024
16 points (80.8% liked)

Futurology

2143 readers
59 users here now

founded 2 years ago
MODERATORS
top 3 comments
sorted by: hot top controversial new old
[–] wahming@monyet.cc 6 points 1 year ago* (last edited 1 year ago)

Welp, that was a load of clickbait headline

TLDR: They trained a LLM to help with knowledge transfer to new junior engineers.

[–] hightime@lemmy.world 4 points 1 year ago (1 children)

Are they limited by design speed or manufacture? I was always under the impression that production is the bottleneck

[–] wahming@monyet.cc 1 points 1 year ago

They're two separate bottlenecks. As long as new designs aren't complete, they keep manufacturing the old one, which is by definition state of the art.