286
this post was submitted on 08 Aug 2026
286 points (99.0% liked)
Technology
87279 readers
3564 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related news or articles.
- Be excellent to each other!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
- Check for duplicates before posting, duplicates may be removed
- Accounts 7 days and younger will have their posts automatically removed.
Approved Bots
founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
I concede that my grasp of the scale involved was unrealistic. However, I don't see a viable solution. The issue, I have realized, isn't how to generate the power, it's the scale of power needed to run these data center monstrosities.
As you say, 7.65 gigawatts is a lot of power. According to ERCOT, Texas just set a new record for power demand in July of 91gw. So this plant, built to supply this one data center complex, will produce power equal to 8.5% as much power as the entire state of Texas required at peak demand this year (so far, anyway). 8.5% of peak demand for the entire state of Texas which, by the way, is the largest energy consuming state. Texas uses about 15% of the total power generated in the entire USA according to EAI.gov.
So if solar and wind (with batteries, of course) would be very challenging, it is at least vaguely possible. Texas is a great state for wind, solar, and geothermal power. It already generates about 30% of it's power from renewables. Texas has a lot of sunny days and a lot of open spaces for wind farms particularly in the western parts of the state. I can think of worse ideas than covering all those oil fields with solar panels or wind farms. You wouldn't even need to stop producing oil. You can do both.
Nuclear really isn't viable. Starting the approval process now, it would easily be 20 years before a new plant would start producing power. No one is waiting two decades to open their data center.
The only other option to power these data centers, the one they are going with, is fossil fuels. That means multiplying the amount of toxic and greenhouse gasses being pumped into our air which is the absolute worst option for everyone on the planet.