381
EV Charging Doesn't Need to Be as Fast as Gas, Ionna CEO Says
(www.thedrive.com)
This is a most excellent place for technology news and articles.
And you think the apartment complexes are going to foot the bull to install that here? Every parking lot would have to be torn up to install that. Its a ridiculous assumprion.
Cutting a narrow trench so you can run electricity out to parts of the parking lot you can't get to otherwise isn't exactly a big deal. Utilities do that sort of thing all the time. We can patch parking lots - we do it all the time. Or even just put a pole and run the lines overhead. And, in many parking lots, you can just run the trench or conduit around the edge of the parking lot. You also don't need every space to be electrified, at least at first.
And who's going to pay for that? I promise you, my shitty complex won't.
Why would a parking lot need to be "torn up" to add a power outlet
Because the parking lot is paved? And you have to break throigh that pavement to run power lines?
You can cut a small trench with a specialized tool.. easy enough.
You don't need to break up the pavement to add chargers. Indoors they usually add chargers to the wall spots, outdoors add them to (solar paneled) shade structures.