this post was submitted on 23 Jun 2023
13 points (100.0% liked)

Technology

59696 readers
2711 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

Solar and wind power generation has set a new record, with more power generated than coal for the first five months of 2023.

top 2 comments
sorted by: hot top controversial new old
[–] altus@sh.itjust.works 2 points 1 year ago (1 children)

The last line of the article I can personally attest to. I am trying to install solar panels on my house and the interconnection approval has taken over 8 months and I expect the overall project will be well over a year. It was originally planned to be up and running in 6 months.

[–] eleitl@lemmy.world 1 points 1 year ago* (last edited 1 year ago)

I haven't bothered with approval and installed an illegal 1.6 kWp system, and illegally (but safely) have the meter running backwards some of the time. Averaging 6 kWh/day so far. So make about half of the electricity I consume in a year.

I will probably add some storage next year, or so.

load more comments
view more: next ›