this post was submitted on 11 Jul 2026
99 points (100.0% liked)

Canada

12251 readers
378 users here now

What's going on Canada?



Related Communities


🍁 Meta


🗺️ Provinces / Territories


🏙️ Cities / Local Communities

Sorted alphabetically by city name.


🏒 Sports

Baseball

Basketball

Curling

Hockey

Soccer


💻 Schools / Universities

Sorted by province, then by total full-time enrolment.


💵 Finance, Shopping, Sales


🗣️ Politics


🍁 Social / Culture


🌐 Other Relevant Communities


Rules

  1. Keep the original title when submitting an article. You can put your own commentary in the body of the post or in the comment section.

Reminder that the rules for lemmy.ca also apply here. See the sidebar on the homepage: lemmy.ca


founded 5 years ago
MODERATORS
 

Telus's plans for two Al data centres in Vancouver could hit a wall, with a city councillor pushing to pause them until the city sorts out some actual rules. OneCity Vancouver Councillor Lucy Maloney is bringing a motion to council on July 15 called "Addressing the Risks of Digital Infrastructure," according to CTV News.

you are viewing a single comment's thread
view the rest of the comments
[–] shitwizard420@crazypeople.online 6 points 1 month ago (1 children)

The city doesn't decide if they get a hydro hookup, BC Hydro does. The city could approve the zoning and BC Hydro could be like, nah.

[–] i_stole_ur_taco@lemmy.ca 4 points 1 month ago (2 children)

Hydro is already running ads telling us to conserve water. I think I know which way they’ll lean.

[–] BlameThePeacock@lemmy.ca 2 points 1 month ago (1 children)

Neither of these two proposed Datacenters in Vancouver or Kelowna are planning to use water evaporation for cooling, so there will be effectively 0 water usage.

[–] BCsven@lemmy.ca 1 points 1 month ago (2 children)

BC power is hydro electric generated. More power means running out of the reservoir water that powers the dam.

[–] BlameThePeacock@lemmy.ca 1 points 1 month ago (1 children)

That's why the power for projects like this is being set up to be auctioned in a competitive process.
https://news.gov.bc.ca/releases/2026ECS0005-000095

However, it's not really a problem at the moment, we aren't short on power capacity. Did you forget we just spent a stupid amount of money building the new Site C Dam?

[–] BCsven@lemmy.ca 1 points 1 month ago

It's not the power output max, its the hot summer and lack of precipitation lowering water level, which effects the dam at some point

It's not that simple.

Drinking water comes from three reservoirs: https://metrovancouver.org/services/water/reservoir-levels-water-use

  • Capilano
  • Seymour
  • Coquitlam

Only the Coquitlam dam is impacted by hydro use: https://metrovancouver.org/services/water/watersheds-reservoirs

The water use planning for Coquitlam can be seen here: https://www.bchydro.com/toolbar/about/sustainability/environmental_responsibility/water-use-plans/lower-mainland/coquitlam-buntzen.html

The diversion for drinking water (MVWD) is downstream the power houses, meaning drinking water diversion is limited by power generation. Further, this station is used for auxillary and peaking because they are not efficient/old.

Sidenote: the trails at the Capilano reservoir are magical ✨ I ended up there by accident a few years back and nwas blown away. Accessible by public transit too!

[–] shitwizard420@crazypeople.online 1 points 1 month ago* (last edited 1 month ago) (1 children)

~~Hydro supplies the water?~~

Sorry, I was wrong in assuming this was an error. I didn't realize overuse of reservoirs was a factor in the capacity.

But I don't understand which way you think they will lean?

[–] i_stole_ur_taco@lemmy.ca 1 points 1 month ago (1 children)

In the past their marketing has always told people to conserve electricity (the thing they sell). I’m reading the switch to conserving water to mean they know they’re going to be diverting significant water from sources for generating dams to “something else”.

Hold on... A few things stand out to me.

Why do you think they want people to buy energy? (Regulated)Hydro companies always want people to conserve electricity because it means they don't need to be constantly upgrading the transmission grid.

Secondly, what would they be diverting water to? Who is they? Hydro may physically control the dams and valves but if you are saying the water needs to go to the data centre when the water is going to come from Metro Van water department, in which case the city does get a say because development is only approved if there is enough capacity. If the data centre is using a lot of water, so much so that it will impact HydroBC in terms of lower reservoirs, it's going to be a massive demand in the city run water service.

If you have questions about how these things are controlled I'd be happy to help answer them using the public documents from these utilities.