shitwizard420

joined 1 year ago

This is a positive step and something that seems rather basic but unfortunately isn't common.

I work with municipalities in Ontario, Canada. I was surprised to learn that only Toronto is required by law to maintain a lobbyist registry. Some municipalities have it in their bylaws and do so voluntarily. That still relies on individual staff knowing and understanding the requirements. I've been surprised how many times I've had to say, "Hey, should this meeting be registered?" and for municipal staff to have no idea it was required or how to comply.

 

Some other articles, including ones from earlier articles with the sink hole:

It's a pretty big main (36") and was installed in 1916. I don't think I saw it referred to as a transmission main but at that size I would be surprised if it wasn't!

It's not that simple.

Drinking water comes from three reservoirs: https://metrovancouver.org/services/water/reservoir-levels-water-use

  • Capilano
  • Seymour
  • Coquitlam

Only the Coquitlam dam is impacted by hydro use: https://metrovancouver.org/services/water/watersheds-reservoirs

The water use planning for Coquitlam can be seen here: https://www.bchydro.com/toolbar/about/sustainability/environmental_responsibility/water-use-plans/lower-mainland/coquitlam-buntzen.html

The diversion for drinking water (MVWD) is downstream the power houses, meaning drinking water diversion is limited by power generation. Further, this station is used for auxillary and peaking because they are not efficient/old.

Sidenote: the trails at the Capilano reservoir are magical ✨ I ended up there by accident a few years back and nwas blown away. Accessible by public transit too!

Hold on... A few things stand out to me.

Why do you think they want people to buy energy? (Regulated)Hydro companies always want people to conserve electricity because it means they don't need to be constantly upgrading the transmission grid.

Secondly, what would they be diverting water to? Who is they? Hydro may physically control the dams and valves but if you are saying the water needs to go to the data centre when the water is going to come from Metro Van water department, in which case the city does get a say because development is only approved if there is enough capacity. If the data centre is using a lot of water, so much so that it will impact HydroBC in terms of lower reservoirs, it's going to be a massive demand in the city run water service.

If you have questions about how these things are controlled I'd be happy to help answer them using the public documents from these utilities.

[–] shitwizard420@crazypeople.online 1 points 1 month ago* (last edited 1 month ago) (2 children)

~~Hydro supplies the water?~~

Sorry, I was wrong in assuming this was an error. I didn't realize overuse of reservoirs was a factor in the capacity.

But I don't understand which way you think they will lean?

Sure you could take a sentence in a reply explaining a very specific scenario and apply it to every situation, but that would be foolish and a waste of time.

[–] shitwizard420@crazypeople.online 6 points 1 month ago (9 children)

The city doesn't decide if they get a hydro hookup, BC Hydro does. The city could approve the zoning and BC Hydro could be like, nah.

 

“We’ve gone through, we’ve cut as thin as we possibly could cut in this 10-year program but I’ll expand on that a little bit more,” Lewis told council. “If we cut capital program, we reduce our level of service. There’s no two ways about it, that is the effect. We will reduce our level of service; we’ll risk additional water main breaks; we’ll risk additional water loss. We don’t want another water main break like we had at Riverside Park. That’s a significant risk. We would increase the risk of boil water advisories.”

In a survey of water and wastewater bills, based on annual volumes of 220 cubic metres, Pembroke’s 2026 rates sees the city remain in the same ballpark as other local municipalities although it does vault ahead of Casselman and Deep River to land just behind Killaloe, Hagarty and Richards (KHR). Petawawa, Arnprior and Ottawa are already slightly lower than Pembroke. Pembroke’s 2027 rates see it jump over KHR and Renfrew landing just behind Mississippi Mills. More expensive municipalities than Pembroke include Laurentian Valley, and Kingston, and especially Whitewater Region and Clarence Rockland.

Oh! Thanks for the correction.

Electricity was stupid expensive in the 90s in Ontario so it made sense to invest in cogeneration engines to burn digester gas or even natural gas and use the electricity on site. Then electricity got cheaper so it still made sense to burn biogas generated on site to lower your peak demands especially if you were paying time of use or you were Class A and needed to do load shedding. Sometimes you'd even get a discount from the electricity company for running your systems because it meant they could delay increasing the grid.

Now, the financial incentive is for carbon credits. You don't get those if you burn on site, you just get to buy less taxed fuels. If you instead upgrade the gas to renewable natural gas (like what is described in the article) and put that in the natural gas grid, you can sell the carbon credits to companies who are required to offset their own generation. I think that is where the money is in these schemes.

(That and the tipping costs for food waste, free slowly digesting material to regulate the digesters in the form of the manure, outsourcing the annoying regulatory bits to the farmers, and building goodwill for green data centres)

I promise this isn't just a well askually but anaerobic digestion (what is being discussed in the article) and composting are different.

Composting requires oxygen. It produces carbon dioxide. It produces heat. Compost has less restrictions for use as a fertilizer than digested mature. I'm not from the US so I don't want to assume it's the same across all states but in Canada you can sell it to the public.

Anaerobic Digesters do not require oxygen. It produces carbon dioxide and methane. It requires heat input to occur at a reasonable rate. Use as a fertilizer is restricted because more pathogens survive. Hydrogen sulphide is produced so sometimes ferric chloride is added, and that reduces the amount of phosphorus available to plants.

One of the trade offs with digestion is that processing the digestate into something usable takes additional energy. If it's a single farm and they are not taking additional feedstock it's no more nutrients that they had before they started digesting. Chances are they can manage the nutrients on site and don't need to input energy.

If they are taking stuff from off-site, or if they expended their operation beyond what they can manage on site then they need to choose if they are going to transport it off-site as a liquid, thicken it into cake (mmmmm), or create a fertilizer product like pellets. Each option requires more energy than the last. They may be able to sell the pellets but typically have to give liquid or cake away for free or pay people to take it.

The operation, run by Pennsylvania-based Ag-Grid Energy, is the first of its kind in the country. The company claims the anaerobic digestion of manure and food waste could be a game-changer, not only in powering crypto, but data centers, which currently use 4.9% of the country’s electricity, a figure that could double by 2030.

There are a handful of net energy producing waste treatment processes in the world, and they all achieve it by taking advantage of hyper local opportunities to optimize. They are not infinitely scalable. For example, T. PARK in China takes sludge from several wastewater plants and uses the energy to power one of them.

Further, it is not truly net positive if it leaves residuals that need further treatment.

The project claims to recycle more than 45,000 gallons of food waste per day and the manure of 4,000 cows. “What we want to do is also provide, if possible through fiber optics, [the] value of the AI computing capacity to that same regional area,” Akki says.

The energy isn't in the manure. Wastewater plants use food waste (co-digestion) to boost methane production of digesters. Some places get the food waste from a municipal green bin program but that's a giant pain and wastewater plants tend to prefer food waste from food manufacturing. So it's unclear if this is diverting the food waste from landfill. The best solution would be to reduce the food waste in the first place. Can you call it green if it is the result of over production?

Don't get me wrong, I am pro-biogas. In municipal wastewater treatment the best results for biogas production come when you direct as much short chain carbon to the digester, which greatly reduces one of the highest electrical loads on the plant (blowers to oxidize carbon).

You're still burning it though. It looks good on paper because the CO2 emissions don't count in Canadian GHG reporting because the source is biogenic. Doesn't change the fact that there are emissions.

The digested waste, or digestate, is meant to be recycled, potentially into a range of products, such as fertilizer and animal bedding.

The energy to turn digestate into a fertilize product is pretty massive. Many of the plants that are energy neutral incinerate and the ash is landfilled.

Digested manure can be more polluting than manure that hasn’t been digested, according to USDA research.

Eeeehhhhh... Technically true but only because people are allowed to operate digesters poorly. I was talking to an engineer in the states who told me his digester was losing 30% of the methane by leaks and I was sitting getting second hand panic but apparently that's not super illegal? We would have problems with the environmental regulators and the TSSA.

The project intended to send about 41,000 gallons of waste per day into a tributary of Walla Walla Creek, which empties into Lake Michigan.

Excuse me what

There are some high level engineering plans available.

Some highlights:

  • daily food waste estimated to be 225 tonnes and it may require on site processing.
  • less than half of the digester feed will be manure.
  • Digesters are mesophilic meaning they need to be heated to and maintained at ~35 C
  • heat for the digester is provided by burning fuel oil 🙃 (most municipal plants burn the biogas)
  • gas upgrading is by chilling, filtering and compressing for transport via pipeline. No mention of energy demands.
  • the project would add runoff capture for manure storage which didn't exist before.
  • the manure needs to be pretreated before digestion to remove sand
  • the project agreement means Vanguard is not responsible for the waste products after the gas is removed.
  • the project will create waste with more nutrients than the farm can land apply on their site. (You know, due to the additional food waste). There are therefore no details about what the plan is for the digestate.
  • based on a news article it sounded like they wanted to build a pipeline to transport it to other farms for land application. That might be where the waste to the creek idea came from? The pipeline was to go under the creek. Maybe that was just if it broke?
  • the enclosed engineering drawings are civil/structural only, no indication of power demand or fuel consumption.

There is also an air pollution permit application available. Additional details about the project include

  • two 750 kw emergency generators (diesel powered)
  • two natural gas boilers at 4 MMBTU/hr (unclear if this is instead of the fuel oil in the other doc?)
  • the pressure relief system was to have a flare, which is positive. It is better to flare gas in an energy versus just venting.

The nutrient management permit application is behind a log in so I can't see it but this article has statements from Vanguard that contradict the engineering plans.

Hanselman says the company never uses human waste in its digesters, which is how PFAS would enter the equation and that the sources of the other organic food waste would likely be byproducts from dairy processing and beer brewing.

The application included provisions for accepting packaged food. The packaging is where the pfas is.

The process Vanguard’s co-digesters use to clean the digestate on the back end, Hanselman says, allows for nutrients to be removed and taken away. That allows the farm to limit the amount of phosphorus and nitrogen that is spread on the farm’s land. He noted that at the company’s first project in Vermont, they’re removing 12 tons of phosphorus per day from the environment.

This is explicitly untrue for the Waupaca project? Vanguard has no part in digestate treatment. Sometimes there is phosphorus removal during H2S removal (if FeCl is used) but this project used a scrubber. So no nutrient reduction.

I obviously can't speak for every project, but this example project would increase the amount of nutrients the farm has to manage (because of the trucked in food waste). It would increase energy consumption, and there was no plan for what to do with the digestate. It's not even clear if there is a net methane release reduction over their previous methods because the carbon in the food is more likely to convert to methane in the digester. The more slow to break down carbon from the manure may still end up on fields.

Food waste digestion needs a less biodegradable feed stock to make the process more stable. In municipal wastewater you balance raw sludge (easily digestible) and secondary sludge (less easily digestible) to ensure the acetogenisis step doesn't poison the methanogens step.

I don't see a benefit to the local community in this proposal at all. If they treated the wastewater using energy efficient methods then maybe? But not this project as it was proposed. Vanguard gets the slowly biodegradable material, land to use, to be absolved of responsibility to deal with byproducts. Seems like a bad deal.

[–] shitwizard420@crazypeople.online 1 points 1 month ago (2 children)

Isn't that what DDG uses?

 

Russian cybercriminals managed to hack into a Quebec municipality's water treatment plant systems and had the ability to wreak havoc on the crucial infrastructure before getting caught, according to Canada's cyber spy agency.

In one particular case discussed in the report, the signals intelligence agency said it was advised last October that Russian hacktivist group NoName had broken into the Quebec water plant's network and gained access to many crucial systems.

According to CSE, NoName claimed it had gained the "ability to covertly control pumps, chlorine dosing, pressure settings and monitoring/alerts systems." The report does not identify the impacted Quebec municipality.

 

Selection of quotes:

But in interviews with The Citizen, Fayette County Administrator Steve Rapson and Assistant County Administrator Jason Tinsley said the issue stemmed from a missed meter reading during Fayette County Water System’s transition to a new countywide smart-meter system — not unauthorized water usage

Rapson said the widely circulated figure of roughly 15 million gallons reflected about six months of combined usage billed at one time — not a single month of consumption.

The original county letter also referenced complaints from residents near the Annelise Park subdivision about low water pressure.

Rapson said Fayette County Water System later installed monitoring equipment in the area to track pressure levels following the complaints.

“Since we’ve been reading it, there’s been no issue,” Tinsley said.

“But keep in mind, the individual that made that complaint made the complaint because they had issues with their well,” Rapson said. “We don’t pull anything out of the ground. We don’t have any wells in our system.”

I just wrote a novel of a reply to someone saying something didn't look quite right about the numbers and guessing the issue was discrepancy between water billing and production . I should have looked for the letter first, and I would have found this article 😭

ETA: why is this dystopian? Maybe something about how a single water meter malfunctioning results in a water utility getting overwhelmed and maybe not investigating as completely as they could before sending letters. Fund your local utilities! 💕

view more: next ›