66
you are viewing a single comment's thread
view the rest of the comments
[-] B0rax@feddit.org 18 points 1 day ago

Because the power cables have been installed 100 years ago. They are not going to dig them up to run data lines.

Wireless smart meters are in place in other countries as well (Germany for example). However, the wireless module is just a plug in module, changing it out takes about 20 seconds.

[-] Midnitte@beehaw.org 7 points 1 day ago

Also in place in the US - they just use 433 MHz I believe, and some dude drives around in a truck collecting readings from the road.

[-] beejjorgensen@lemmy.sdf.org 3 points 1 day ago

In my US town, it transmits to a nearby receiver on a power pole. Same with water. But also in the US buried power cables are the exception.

[-] DahGangalang@infosec.pub 2 points 1 day ago

Oh, missed that this is retrofitting onto old service. I suppose that does make sense (still kinda hate it).

Yeah, sounds Luke theyre making this more complicated than it needs to be.

this post was submitted on 11 Nov 2026
66 points (98.5% liked)

Technology

43843 readers
123 users here now

A nice place to discuss rumors, happenings, innovations, and challenges in the technology sphere. We also welcome discussions on the intersections of technology and society. If it’s technological news or discussion of technology, it probably belongs here.

Remember the overriding ethos on Beehaw: Be(e) Nice. Each user you encounter here is a person, and should be treated with kindness (even if they’re wrong, or use a Linux distro you don’t like). Personal attacks will not be tolerated.

Subcommunities on Beehaw:


This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.

founded 4 years ago
MODERATORS