this post was submitted on 18 Sep 2024
5 points (100.0% liked)

Rocket Lab

98 readers
3 users here now

A community for discussing Rocket Lab, the US/New Zealand aerospace company. All posts related to Rocket Lab are welcome.

Other space and rocket related communities:

founded 8 months ago
MODERATORS
 

Kinéis Killed The RadIoT Star

| Scheduled for (UTC) | 2024-09-20 23:01 | |


|


| | Scheduled for (NZST) | 2024-09-21 11:01 | | Launch site | Rocket Lab LC-1A, Māhia Peninsula, New Zealand | | Booster recovery | No | | Launch vehicle | Electron + Curie | | Customer | Kinéis | | Payload | Kinéis 6-10 | | Mission success criteria | Successful deployment of spacecraft into desired orbit |

Livestreams

| Stream | Link | |


|


| | Rocket Lab (official) | https://www.youtube.com/watch?v=beVTGh_PrA0 (scrub) | | Space Affairs | https://www.youtube.com/watch?v=lDMBcSt4PUo (scrub) | | The Launch Pad | https://www.youtube.com/watch?v=87oFE1ZmRck (scrub) |

Stats

  • This will be the 11th launch for Rocket Lab this year.
  • This will be the 53rd overall launch for Rocket Lab.

Payload info:

Rocket Lab mission page

NextSpaceflight:

Second batch of five satellites for the French Kinéis IoT constellation designed to operate with 25 nanosatellites of 30 kg each. The constellation will enable Kinéis, a company backed by private and public investors including the French government’s space agency CNES (Centre National d'Études Spatiales) and CLS (Collecte Localisation Satellites) an international space-based solutions provider, to improve its global IoT connectivity.


Previous mission: A Sky Full Of SARs

Next mission: Changes In Latitudes, Changes In Attitudes

Please post small launch updates, discussions, and questions here! Also feel free to leave feedback or suggestions for the mod team. We’re a relatively new community, so feedback is very valuable!

top 19 comments
sorted by: hot top controversial new old

Since it was an instantaneous launch window, that's a scrub for the day.

https://x.com/RocketLab/status/1836483969304662306

Electron is vertical on the pad at LC-1. It’s almost time to go to space.

Lift-off:
🚀 NZST = 11:00 am
🚀 EDT = 7:00 pm
🚀 PDT = 4:00 pm
🚀 UTC = 11:00 pm
📺 Webcast: https://www.youtube.com/watch?v=6dPkZOKYvWo

[–] threelonmusketeers@sh.itjust.works 2 points 2 months ago (1 children)

Launch abort upon engine ignition.

[–] Dave 2 points 2 months ago (1 children)

Ooh something happened on engine ignition? I'd be keen to hear more once there are updates.

[–] threelonmusketeers@sh.itjust.works 2 points 2 months ago (1 children)

Tweets from Peter Beck and Rocket Lab:

https://x.com/Peter_J_Beck/status/1836553721708237055

Just an abort triggered by a piece of ground support equipment not reaching its target in the allocated time. We like everything on the ground to be just as happy as everything in the sky.

https://x.com/RocketLab/status/1836554238367010854

Mission update: In today’s launch attempt for @KineisIoT during ignition at T-0, Electron’s flight computer aborted on a ground systems sensor trigger and safely shut down the engines. Electron, the launch pad, and Kineis’ payload all remain healthy. Standby for info on our next launch attempt.

No details on what sensor it was, but it sounds like it's not too serious. Hope they can quickly identify the cause and try again in a day or two.

[–] Dave 2 points 2 months ago (1 children)

Thanks for the update! You're right, it doesn't sound too serious.

[–] threelonmusketeers@sh.itjust.works 2 points 2 months ago (1 children)

New T-0 roughly 90 minutes from now. (23:01 UTC, 11:01 NZST)

[–] Dave 2 points 2 months ago* (last edited 2 months ago)

Nice, thanks for the heads up!

Edit: got it on the TV with 3 kids watching!

Webcast is live! https://www.youtube.com/watch?v=6dPkZOKYvWo

Prachi Sukhnani (Avionics Engineer) and Andrew Haigh (Senior Software Engineer) are hosting.

https://x.com/RocketLab/status/1837241523949424741

Liquid oxygen propellant is now filling Electron as the countdown to launch continues.

Now just under T-2 hours to lift-off from LC-1 Pad A for today’s ‘Kineis Killed the RadIOT Star’ mission.

Go no-go poll is complete; they are go for terminal count.

MECO, stage separation, and stage 2 ignition!

Fairing jettison confirmed.

Battery hotswap confirmed.

[–] threelonmusketeers@sh.itjust.works 2 points 2 months ago* (last edited 2 months ago)

SECO and kickstage separation confirmed. Curie engine burn scheduled for T+51 minutes.

First Curie burn confirmed.

Payload deploy confirmed!

Second Curie burn confirmed.